• Sourcing Solutions
  • Services & Membership
  • Help & Community

Quick Details

  • Condition: New
  • Application: building constructions
  • Automatic Grade: Automatic
  • Production Capacity: 30000tons~300000tons/year
  • Place of Origin: Hebei, China (Mainland)
  • Brand Name: Lvjoe
  • Model Number: Lvjoe-1
  • Voltage: 380V/50HZ
  • Power(W): 200-800kw
  • Dimension(L*W*H): accoding to the capacity
  • Weight: accoding to the capacity
  • Features: New,Advacend technology
  • Certification: CE,ISO9001
  • Warranty: 3 years, 5 years
  • After-sales Service Provided: Engineers available to service machinery overseas
  • Capacity: 30,000 tons per year
  • Calciner: Fludized bed furnace
  • Control system: Distributed control system
  • Certificate: CE, ISO
  • Our engineer: Designed first gypsum powder plant of China
  • Installation: Within 2 months
  • Training course: by skilled engineers
  • Main market: Egypt, Russia, Turkey, Thailand, Saudi Arabia,Iran...
  • Name: gypsum powder production line

Packaging & Delivery

Packaging Details: In wooden case and in nude 40GP container and FR container average weight of container: 20 tons we can offer loading pictures for your reference.
Delivery Detail: 2 to 6 months after received the down payment.

 

Gypsum powder production line

 

Product introduction

 The crusher breaks the big sized gypsum ore into small ones with 25mm in diameter. After storing and 

 conveying, they are taken into the mill for grinding. Then, the power concentrator carries the gypsum 

 powders which match to the needed fineness to the calciner for calcining. Others are back to the mill 

 until it is qualified. In the end, after calcining, the qualified gypsum powder are sent to clinker container 

 for storing, or are sent to the manufacturing workshops for use

Processing craft

 

Equipments List

 

No.

Name

Specification

Quantity (set)

Function

Note

1

Feeding hoper

5m³

1

 

 

 

 

 

 

 

 

Batching system

 

2

Additive agent hoper

1m³

1

 

3

Weighing belt

DEL0525

1

 

4

Disk feeder

Φ500

1

 

5

Magnetic

iron remover

 

1

 

6

Belt conveyor

DJ-500

1

 

7

Hot air furnace

3 million

kilocalorie

1

 

 

Drying system

 

8

Air blower

 

1

 

9

Rotary dryer

Φ1.8m x 18

1

 

10

Screw conveyor

LS315

1

raw

material conveyor

 

11

Bucket elevator

TH315

1

 

12

Buffer silo

 

1

 

 

13

screw

conveyor

Φ300

2

 

 

14

Calciner

2m x 1.8m

1

 

Calcined system

 

15

Electric precipitator

Φ600 x 4

1

 

16

Buffer silo

1.5 m³

1

 

 

17

Ball grinding mill

Φ1.5 x 4.5m

1

Grind, modify

 

18

Bucket elevator

TH315

1

 

 

19

Finished

product warehouse

 

2

 

 

20

Thermal oil boiler &

auxiliary equipment

3 million

kilocalorie

1

Supply heat source

 

 

Capacity list

gypsum powder production line capacity list  :

 

Capacity/T

/

Ton/hour

/

Raw gypsumrock consumption T/year

 

Heat supplying way

 

Boiling furnace size

30,000

4.2

36,000

 

4.5M×1.2M×1.4M

50,000

6.9

60,000

4.5M×1.4M×1.6M

60,000

8.3

72,000

4.5M×1.6M×1.8M

80,000

11.11

96,000

4.5M×1.8M×2.0M

100,000

13.88

120,000

4.5 M×2.0 M×2.2 M

150,000

20.83

180,000

4.5 M×2.2 M×2.4 M

200,000

27.77

240,000

4.5 M×2.4 M×2.6 M

300,000

41.66

360,000

4.5 M×2.6 M×2.8 M

 

Workers distribution

The Crusher System: 2 person/ day (including the forklift driver

 

The Mill System: 1 person/ eight hours (that is 3 people/ day)

 

The Calcine System: 1 person/ eight hours (that is 3 people/ day)

 

The Heat Supply System: 2 people/eight hours(that is 6 people/day)   

 

Electrical Engineering: 1 person/ day 

 

Machinery Maintenance:  1 person/ day 

 

In total: 16 person 

Manufacture pictures

 

Product parameters

Product parameters (GB9776-88) of full automatic gypsum powder production line


1. Fineness: not less than 100 meshes.

 

2. Flexural strength (This has a direct relationship with raw materials.): not less than 1.8Mpa; compressive strength: not less than 3.0Mpa.

 

3. Main phase composition: Semi-hydrated gypsum content: not less than 80%, adjustable Dihydrate gypsum content : less than  5% , adjustable Soluble anhydrous gypsum content: less than 5%, adjustable

 

4. Initial solidification time: 3 ~ 8 min, adjustable; final solidification time: 6 ~ 15 min, adjustable.

 

5. Standard consistence: 78 ~ 85%, adjustable

Our service

1) The machine guarantee 5 years except the easy worn parts such as bearings, electric buttons.

2) machine delivery time: 2 to 4 months after the deposit.

3) payment terms: TT or LC

4) machine installation and commission: 2 to 3 months when the buyer prepare the installation and commission conditions.

5) we offer engineers train the buyers' worker to operate the machine and after you master the machine then pay us the installation and commission payment.

6) In order to guarantee the machine running, each year we will send engineer to check and development the technology with the buyer.

7) If the buyer can not run the machine well then we will send the production engineers to help the buyer to run the machine, and we can cooperate for long terms.

 

Transaction History of the Supplier

Below is the information about the supplier's transactions conducted via Alibaba.com. If you require further details regarding the transaction data, please contact the supplier directly.

Transaction Overview

Transactions

Transaction Details

This supplier has completedtransactions with buyers from .

Shipping Destination
Transaction Value
Transaction Date
Email to this supplier
China (Mainland) | Manufacturer, Trading Company
Transaction Level:
Supplier Assessments:
The supplier supports Trade Assurance – A free service that protects your orders from payment to delivery.
Supplier's Trade Assurance Limit: US $92,000
Learn More